Lindgesfeld 26, 42653 Solingen
Icon legend
This icon indicates an awarded building
This icon indicates a listed building
Projects with this logo are on the UNESCO World Cultural Heritage list
Project has been converted, renovated or extended
x close
2001 - 2002
Rauh, Damm, Stiller und Partner
Advanced search with more criteria
Total projects: 483
42651 Solingen
Distance: 4.32 km
42781 Haan
Distance: 4.38 km
42117 Wuppertal
Distance: 4.51 km
42659 Solingen
Distance: 5.98 km
The new building of a production and admin building for CD Design GmbH provides the industrial estate Dyckerfeld in Solingen with an example of attractive industrial architecture.
The complex is broken down into a smaller admin building and a production building aligned along the adjacent streets. By making use of the slope it was possible to “bury” the bulk of the production building’ s structure, which makes for very pleasant dimensions.
And there is extensive storage space even beneath the production sites.
The glazed admin building has a lamellar curtain and is separated from the production building by a sheet of concrete.
Daylight is fed into the large production building through light bands in the roof and the façades.
Award: Vorbildliche Bauten in Nordrhein-Westfalen 2005 (Land NRW/Architektenkammer NRW) [Exemplary buildings in North Rhine – Westphalia 2005; Land NRW/chamber of architects NRW]
Awards:
Exemplary buildings in North Rhine – Westphalia 2005; Land NRW/chamber of architects NRW
Author: Editorial baukunst-nrw
Categories:
Architecture » Commercial Buildings » Offices