General view with the townscape

General view with the Rhine

Total projects: 483

Full-text search:

Search projects:

search

Advanced search with more criteria

Total projects: 483

Oberkasseler Brücke

Oberkasseler Brücke was opened in 1976. Just like the other bridges of the family it is a cable-stayed bridge, which through its slender design gives a filigree and dynamic impression. Theodor-Heuss-Brücke’s stream bridge has a length of 614m and a max. span 257m. It is 35m wide and has two lanes in each direction plus a parallel foot and cycle path in each direction. A free-standing 104m pylon bears the steel cables on which the flat steel structure of the bridge girder is hung. The bridge was built from October 1969 47m upstream of the temporary bridge, which carried the traffic during construction. In 1973, the new bridge did and the temporary bridge was demolished. In 1976, the entire Oberkasseler Brücke was shifted 47m to the site of the original bridge. The shifting of the 12,700t bridge was done by hydraulic presses and lasted 12hrs 47min.

Author: editorial baukunst-nrw
Last changed on 09.10.2007

 

Categories:
Engineering » Transportation

keine Aktion...

Cookie notice
We use cookies. Some of them are essential for the website to work. Others help to continuously improve our online offer. You can find information in our privacy policy


Edit cookie settings
Here you can select or deactivate different categories of cookies on this website.

🛈
🛈